Keep the schedule. Pass the inspection. Hit the CO date.
GCs lose money when a pour fails the 28-day, when a soil tech doesn't show up, or when an inspector won't sign off. We exist to keep that from happening.
The problems that cost you money — and how we fix them.
Tech no-shows that push a pour and burn a day of crews.
Dedicated project techs assigned in advance — no scrambling on pour day.
Field reports that come three days later, after the issue is buried.
Same-day field reports — and a phone call before the truck leaves the gate.
Pre-qualifying a testing agency for a public-works bid.
Pre-stamped agency packages for UDOT, FAA, and municipal bid submissions.
Disputed cylinder breaks at month-end.
ACI Grade I techs, CCRL-inspected lab, and inspectors willing to defend results.
Built for the way your team actually works.
Trusted GC partner on $2B+ in completed Intermountain construction since 1991.

“The IMT team plugs in like a part of our own crew — always on time, always on spec, and always answering the phone.”
